cec work queue follow-up date

Work Queue — the shipped design

RESPONSIBILITIES

  • User research
  • Research synthesis
  • Interaction and interface design
  • Stakeholder communication

THE BRIEF

Cornerstone Equipment Credit (CEC) needed a way to stop applications from stalling in analysts' queues. A solution had already been scoped. As the sole UX designer embedded with the product and engineering team, I set out to validate it before building it.

Presets

All Overdue
My Queue
High Priority

Status

In Review
Qualified
Pending
Follow-Up Date
Jun 11, 2026Overdue
Jun 13, 2026Overdue
Jun 20, 2026Overdue

Work Queue

127 applications·6 follow-ups overdue
process
1
STRATEGY
2
RESEARCH
3
SYNTHESIS
4
DESIGN
5
TEST
Combine harvester

context

Cornerstone Equipment Credit (CEC) is a North American lender, financing commercial and agricultural equipment through a network of dealers. Its credit analysts work inside Credit Hub, reviewing applications and moving each one toward a decision from a shared queue called the Work Queue. Applications that should resolve in hours or days were sitting untouched for weeks, sometimes months.

Farmer in field

proposal

The proposed fix was a Follow-Up Date column, set using an existing application status: Pending. On paper, it was clean and didn't require any massive rework. Before committing, I wanted to understand how analysts actually worked the queue, and whether a Pending-driven follow-up date would fit how analysts moved through Credit Hub. I created some design concepts and put them in front of our users.

work queue before

Work Queue before

research

1
Observe

Watched analysts work their actual applications in real time: how they moved through the queue, what they tracked and used within the system.

2
Probe

Asked directly about the Pending status: did they use it, and in what cases?

3
Test

Showed new design options and asked for their preference.

FINDING

Neither analyst used Pending. Neither knew it existed.

One set applications to Qualified instead; the other wasn't sure they could change an application's status to Pending at all. The mechanism the proposed solution depended on was invisible to the people meant to use it. If the Follow-Up Date could only be set through Pending, the column we were building would ship empty.

synthesis

Two problems were wearing one solution: analysts needed a visible way to track follow-ups inside the workflow they already used, and the business wanted analysts to adopt a status they didn't know existed. This was a change-management effort, not a layout fix. Once separated, the two weren't mutually exclusive. We could give analysts follow-up tracking, while the business pursued Pending adoption on its own track.

Row of excavators

design

Both analysts independently preferred a plain Follow-Up Date over a day-count. It was easier to glance at and interpret. Beyond the column, they responded to OVERDUE and NEW labels, a queue color-coded by priority, and filters tucked into a drawer instead of crowding the table.

Date vs. day-count comparison

work queue after

Work Queue after

Talk design
to me.